5-DAY DRY OUT VINYL DAY - POST # 94 - (15 DEC)

Big inland snow storm warning day, but we drove the 90 miles into Eugene anyway, took 2 1/2 hours to cut the vinyl to the bertthing-head, and galley-wardroom, ran out oftime to cut the forward dry stores floor, so we left it for another day
no rain expected for 5 days !

After drying out, it is possible to caulk those few leaks away.... and get the hull hole cut for the dock water inlet, so piping and the new hot water heater can be installed. Then, it's on to the electric, fully analyzing converting this vessel to 120/240  (50 amp per leg) 100 amp total 120 volt useage.... this 30 amp total is 1950's stuff..

Got the vinyl unloaded to the warehouse, and, did the shopping to stay home over the week-end...